Spent a couple hours on Sunday undoing some of my wiring. Just replaced a couple three-wires with two two wires (that GFI thing). The extra wires are gonna require an extra trip to the snug recesses of the attic, and I’m gonna have to replace a single-gang box or two with two-gang boxes to accommodate the extra wires. Probably put in three hours or so of work. Only stopped because I had some other stuff to take care of. Really wanted to put in more time, but got dragged away. However I might have lucked out. I felt fine Sunday night, but was suffering the next morning, and Tuesday was even worse.
I’m a little frustrated…
I’m gonna try to spend a little time on this thing whenever a chance comes up, and hopefully I build up a little tolerance to manual labor -we’ll see.
Tags: Kitchen remodel